Borehole Site: ES-AC-1Billiton
Data Contact: J Safanda (CZ)


Date of measurement (year): 1991.76
Estimated prior steady state GST (°C): 17.60
Estimated mean conductivity (W m-1 K-1): 2.50
Estimated mean thermal gradient (K km-1): 19.00

Depth Below Surface (m)   Temperature (°C)

22.24 20.29 26.80 20.32 31.18 20.34 35.68 20.38 40.10 20.42 44.60 20.48 49.09 20.53 53.38 20.58 57.87 20.63 62.34 20.69 67.68 20.75 71.30 20.80 75.73 20.86 80.14 20.93 84.73 20.99 89.10 21.05 93.55 21.11 98.09 21.17 102.42 21.24 106.93 21.31 111.38 21.38 115.79 21.45 120.34 21.53 124.79 21.62 129.20 21.69 133.61 21.76 138.17 21.85 142.53 21.93 147.08 22.03 151.43 22.12 156.01 22.21 160.33 22.30 164.89 22.39 169.29 22.47 173.75 22.55 178.20 22.64 182.66 22.74 187.02 22.84 191.58 22.92 196.06 23.02 200.50 23.11 204.85 23.21 209.38 23.29 213.84 23.38 218.21 23.47 222.79 23.57 227.23 23.66 231.67 23.76 236.12 23.85 240.64 23.94 244.98 24.03 249.45 24.12 254.02 24.22 258.39 24.31 262.89 24.40 267.36 24.48 271.74 24.58 276.24 24.67 280.64 24.77 285.03 24.87 289.66 24.97 294.11 25.06 298.51 25.16 303.00 25.25 307.40 25.35 311.86 25.44 316.33 25.54 320.82 25.62 325.29 25.74 329.74 25.82 334.13 25.92 343.09 26.11 347.45 26.21 351.92 26.31 356.36 26.41

NOTE: The data listed above are the actual data we used in the reconstruction. The original observations may have begun at a shallower depth, or may have extended to a greater depth. Please contact the data contact person for more information about this borehole site.


Back to Borehole Temperatures and Climate Reconstruction Homepage